DSAHR-3

Image is for reference,
please contact us to get the real picture

Part No :

DSAHR-3

Manufacturer
Mitsubishi Materials U.S.A
Description
GDT 800V 5KA 2 POLE THROUGH HOLE
Catalog
Gas Discharge Tube Arresters (GDT)
Shipped from
HK warehouse
Expected Shipping Date
Apr 28 - May 02 2024
DataSheet
DSAHR-3 PDF
Availability
10 pieces
Unit Price
$54.00000

Due to the large price fluctuation in 2021-2022, please send an inquiry to get the latest quotation, The current price of DSAHR-3 is for reference only, if you want to get the best price, please submit an inquiry or email directly to our sales team [email protected]

Type Description
Series:DSAHR
Package:Bulk
Part Status:Active
Voltage - DC Spark Over (Nom):800 V
Impulse Discharge Current (8/20µs):5000A (5kA)
Tolerance:±20%
Number of Poles:2
Fail Short:No
Mounting Type:Through Hole
Package / Case:Radial, Box
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT B88069X0680T502

B88069X0680T502

GDT 255V THROUGH HOLE
HOT 2036-15-B2LF

2036-15-B2LF

GDT 150V 10KA 3 POLE TH
HOT GTCR37-201M-R10-FS

GTCR37-201M-R10-FS

GDT 200V 10KA 3 POLE TH
DSAHR-3

DSAHR-3

GDT 800V 5KA 2 POLE THROUGH HOLE

Top