PL155-P

Image is for reference,
please contact us to get the real picture

Part No :

PL155-P

Manufacturer
AIMtti
Description
PWR SUPP SNGL OUT 0-15V0-5A USBR
Catalog
Equipment - Power Supplies (Test, Bench)
Shipped from
HK warehouse
Expected Shipping Date
May 21 - May 25 2024
DataSheet
PL155-P PDF
Availability
0 pieces
Unit Price
$660.00000

Due to the large price fluctuation in 2021-2022, please send an inquiry to get the latest quotation, The current price of PL155-P is for reference only, if you want to get the best price, please submit an inquiry or email directly to our sales team [email protected]

Type Description
Series:PL
Package:Box
Part Status:Active
Type:Bench (AC to DC)
Voltage - Supply:230VAC, 115VAC
Voltage - Output:0 ~ 15VDC
Current - Output:0 ~ 5A
Display Type:Digital
Number of Characters:4, 4
Number of Outputs:1
Size / Dimension:13.504" L x 4.213" W x 5.157" H (343.00mm x 107.00mm x 131.00mm)
Features:Constant Current and Constant Voltage Indicators, Linear, RS-232, USB, LAN (LXI)
Power (Watts):75W
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT BOP 200-1DC802E

BOP 200-1DC802E

POWER SUPPLY RACK MNT 200W CAPAC
HOT SL300-13.2/480+LXI

SL300-13.2/480+LXI

POWER SUPPLY PROGRAMED DC 4 KW 0
HOT SL1500-5.3/208+LXI

SL1500-5.3/208+LXI

PWR SUP 0-1500VDC 8000W 0-5.3A
LS037V7DW03A

LS037V7DW03A

TFT 3.7"LCD COLOR W/LED BCK LT

DD62S00HT20

DD62S00HT20

CONN D-SUB HD HOUSING RCPT 62POS

2371R

2371R

CORD COIL DUAL COND GND R/A 20'

PL155-P

PL155-P

PWR SUPP SNGL OUT 0-15V0-5A USBR

Top