DCK-3R3E404T-E

Image is for reference,
please contact us to get the real picture

Part No :

DCK-3R3E404T-E

Manufacturer
Elna America
Description
CAP 200MF -20% +80% 3.3V SMD
Catalog
Electric Double Layer Capacitors (EDLC), Supercapacitors
Shipped from
HK warehouse
Expected Shipping Date
Jun 30 - Jul 04 2025
DataSheet
DCK-3R3E404T-E PDF
Availability
0 pieces
Unit Price
$0.00000

Current price of DCK-3R3E404T-E is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:DCK
Package:Tape & Reel (TR)
Part Status:Last Time Buy
Capacitance:400 mF
Tolerance:-20%, +80%
Voltage - Rated:3.3 V
ESR (Equivalent Series Resistance):200Ohm @ 1kHz
Lifetime @ Temp.:500 Hrs @ 60°C
Termination:SMD (SMT) Tabs
Mounting Type:Surface Mount
Package / Case:Coin, Thin Terminals - Same Sides
Lead Spacing:-
Size / Dimension:0.268" Dia (6.80mm)
Height - Seated (Max):0.083" (2.10mm)
Operating Temperature:-10°C ~ 60°C
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT EDLHW335D2R3R

EDLHW335D2R3R

CAP 3.3F 2.3V THROUGH HOLE
HOT ESHSR-1200C0-002R7A5

ESHSR-1200C0-002R7A5

CAP 1200F 0% +20% 2.7V CHAS MT
HOT EEC-SE0H104

EEC-SE0H104

CAP 100MF -20% +80% 5.5V T/H
MP528-C

MP528-C

28 AWG, CATEGORY 5E, UTP MODULAR

1SNK147081R0000

1SNK147081R0000

SNK PRE-PRINTED

WR54-A106

WR54-A106

WR54 LTE ROUTER SINGLE WI-FI

DCK-3R3E404T-E

DCK-3R3E404T-E

CAP 200MF -20% +80% 3.3V SMD

Top