83161056

Image is for reference,
please contact us to get the real picture

Part No :

83161056

Manufacturer
Murrplastik
Description
CORRUGT COND EW-PA M16/P11 1=50M
Catalog
Protective Hoses, Solid Tubing, Sleeving
Shipped from
HK warehouse
Expected Shipping Date
Jul 17 - Jul 21 2025
DataSheet
83161056 PDF
Availability
2 pieces
Unit Price
$122.96000

Current price of 83161056 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Bulk
Part Status:Active
Type:Wire Loom, Protective Hose
Type Attributes:Convoluted, Corrugated
Diameter - Inside:0.469" (11.90mm)
Diameter - Outside:0.618" (15.70mm)
Material:Polyamide (PA6), Nylon 6, Halogen Free
Color:Black
Length:164' (50.00m)
Wall Thickness:-
Operating Temperature:-40°C ~ 120°C
Heat Protection:-
Abrasion Protection:-
Liquid Protection:-
Environment Protection:UV Resistant
Features:-
Material Flammability Rating:UL94 HB
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT TFT20018 NA005

TFT20018 NA005

TUBING 0.04" ID PTFE 100' NAT
HOT P10510 CL002

P10510 CL002

TUBING 0.102" ID PVC 500' CLEAR
HOT SFAG.03RD250

SFAG.03RD250

SLEEVING 0.234" ID FBRGLASS 250'
83161056

83161056

CORRUGT COND EW-PA M16/P11 1=50M

AD705-00E

AD705-00E

MAGNETIC SWITCH OMNIPOLAR 8MSOP

R9999

R9999

INDUSTRIAL TOOL BAG

50-1101

50-1101

PAPER TONER TRANSFER, 10 SHEETS

Top