9406 T35500

Image is for reference,
please contact us to get the real picture

Part No :

9406 T35500

Manufacturer
Belden
Description
CBL 2PR 22AWG SHLD
Catalog
Multiple Conductor Cables
Shipped from
HK warehouse
Expected Shipping Date
Aug 19 - Aug 23 2025
DataSheet
9406 T35500 PDF
Availability
0 pieces
Unit Price
$912.37000

Current price of 9406 T35500 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Spool
Part Status:Active
Cable Type:Multi-Pair
Number of Conductors:4 (2 Pair Twisted)
Wire Gauge:22 AWG
Conductor Strand:7/30
Conductor Material:Copper, Tinned
Jacket (Insulation) Material:Poly-Vinyl Chloride (PVC)
Jacket (Insulation) Diameter:-
Shield Type:Foil
Length:500.0' (152.4m)
Jacket Color:Beige
Ratings:UL Style 2464
Features:Drain Wire
Voltage:300 V
Operating Temperature:-20°C ~ 80°C
Usage:Audio, Control, Instrumentation
Jacket (Insulation) Thickness:0.0330" (0.838mm)
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 55PC1134-24-3/6/9-3

55PC1134-24-3/6/9-3

55PC CABLE
HOT 6120UL 0091000

6120UL 0091000

CBL 2COND 14AWG FLRST
HOT 5100/20C SL005

5100/20C SL005

CABLE 20COND 24AWG SHLD 100'
RT0603FRE07158KL

RT0603FRE07158KL

RES SMD 158K OHM 1% 1/10W 0603

73398-104LF

73398-104LF

CONN HEADER SMD 22POS 2.54MM

9406 T35500

9406 T35500

CBL 2PR 22AWG SHLD

CT68133001

CT68133001

99M0111-14-94

Top