E1036S.41.02

Image is for reference,
please contact us to get the real picture

Part No :

E1036S.41.02

Manufacturer
General Cable
Description
6C/18 7/15.2BC UNSH CMR/CL3R
Catalog
Multiple Conductor Cables
Shipped from
HK warehouse
Expected Shipping Date
Aug 26 - Aug 30 2025
DataSheet
E1036S.41.02 PDF
Availability
0 pieces
Unit Price
$0.00000

Current price of E1036S.41.02 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Spool
Part Status:Active
Cable Type:Multi-Conductor
Number of Conductors:6
Wire Gauge:18 AWG
Conductor Strand:7/26
Conductor Material:Copper, Bare
Jacket (Insulation) Material:Poly-Vinyl Chloride (PVC), Riser
Jacket (Insulation) Diameter:0.216" (5.49mm)
Shield Type:-
Length:1000.0' (304.8m)
Jacket Color:White
Ratings:ASTM B-3
Features:Rip Cord
Voltage:300 V
Operating Temperature:-20°C ~ 75°C
Usage:-
Jacket (Insulation) Thickness:0.0150" (0.381mm)
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT M5397 SL199

M5397 SL199

CBL 8COND 18AWG SLT 3000=3000'
HOT XM1204L BK199

XM1204L BK199

CBL 4COND 12AWG BLK 1000=1000'
HOT M9240162 BK002

M9240162 BK002

MULTI-PAIR 32COND 20AWG BLK 500'
SIT1602BI-72-XXS-60.000000D

SIT1602BI-72-XXS-60.000000D

MEMS OSC XO 60.0000MHZ H/LV-CMOS

P51-100-G-T-I12-5V-000-000

P51-100-G-T-I12-5V-000-000

SENSOR 100PSI 7/16-20-2B 1-5V

1199860000

1199860000

BOX S STEEL 9.02"L X 5.98"W

E1036S.41.02

E1036S.41.02

6C/18 7/15.2BC UNSH CMR/CL3R

Top