GRM31CC70G226KE01K

Image is for reference,
please contact us to get the real picture

Part No :

GRM31CC70G226KE01K

Manufacturer
TOKO / Murata
Description
CAP CER 22UF 4V X7S 1206
Catalog
Ceramic Capacitors
Shipped from
HK warehouse
Expected Shipping Date
Aug 15 - Aug 19 2025
DataSheet
GRM31CC70G226KE01K PDF
Availability
0 pieces
Unit Price
$0.25516

Current price of GRM31CC70G226KE01K is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:GRM
Package:Tape & Reel (TR)
Part Status:Active
Capacitance:22 µF
Tolerance:±10%
Voltage - Rated:4V
Temperature Coefficient:X7S
Operating Temperature:-55°C ~ 125°C
Features:-
Ratings:-
Applications:General Purpose
Failure Rate:-
Mounting Type:Surface Mount, MLCC
Package / Case:1206 (3216 Metric)
Size / Dimension:0.126" L x 0.063" W (3.20mm x 1.60mm)
Height - Seated (Max):-
Thickness (Max):0.071" (1.80mm)
Lead Spacing:-
Lead Style:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 1808J6300681JCR

1808J6300681JCR

CAP CER 680PF 630V C0G/NP0 1808
HOT 2225Y0630180JFR

2225Y0630180JFR

CAP CER 18PF 63V C0G/NP0 2225
HOT MA0402YV473Z100

MA0402YV473Z100

CAP CER 0.047UF 10V Y5V 0402
GRM31CC70G226KE01K

GRM31CC70G226KE01K

CAP CER 22UF 4V X7S 1206

CP-AD-584

CP-AD-584

CONN ADAPT JACK-JACK BNC 75 OHM

Q-2Y02Z0008009I

Q-2Y02Z0008009I

SMA-SJB/SMA-SJ RG58 9I

R05P209D/R6.4

R05P209D/R6.4

DC DC CONVERTER +/-9V 2W

Top