2017-42-A-RPLF

Image is for reference,
please contact us to get the real picture

Part No :

2017-42-A-RPLF

Manufacturer
J.W. Miller / Bourns
Description
GDT 420V 10KA 2 POLE SMD
Catalog
Gas Discharge Tube Arresters (GDT)
Shipped from
HK warehouse
Expected Shipping Date
May 10 - May 14 2024
DataSheet
2017-42-A-RPLF PDF
Availability
0 pieces
Unit Price
$0.59125

Due to the large price fluctuation in 2021-2022, please send an inquiry to get the latest quotation, The current price of 2017-42-A-RPLF is for reference only, if you want to get the best price, please submit an inquiry or email directly to our sales team [email protected]

Type Description
Series:2017
Package:Tape & Reel (TR)
Part Status:Active
Voltage - DC Spark Over (Nom):420 V
Impulse Discharge Current (8/20µs):10000A (10kA)
Tolerance:±20%
Number of Poles:2
Fail Short:No
Mounting Type:Surface Mount
Package / Case:Microde Button
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 2036-42-B2

2036-42-B2

GDT 420V 10KA 3 POLE TH
HOT 2035-30-B

2035-30-B

GDT 300V 5KA 2 POLE THROUGH HOLE
HOT B88069X4180B502

B88069X4180B502

GDT 300V 2.5KA 2 POLE TH
2017-42-A-RPLF

2017-42-A-RPLF

GDT 420V 10KA 2 POLE SMD

Top