BACC63CU11-99SD

Image is for reference,
please contact us to get the real picture

Part No :

BACC63CU11-99SD

Manufacturer
Souriau-Sunbank by Eaton
Description
BACC 7C 7#20 SKT RECP
Catalog
Circular Connectors
Shipped from
HK warehouse
Expected Shipping Date
Aug 15 - Aug 19 2025
DataSheet
BACC63CU11-99SD PDF
Availability
3 pieces
Unit Price
$101.03000

Current price of BACC63CU11-99SD is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:*
Package:Bulk
Part Status:Active
Connector Type:-
Number of Positions:-
Shell Size - Insert:-
Shell Size, MIL:-
Mounting Type:-
Mounting Feature:-
Termination:-
Fastening Type:-
Orientation:-
Shell Material:-
Shell Finish:-
Contact Finish - Mating:-
Color:-
Ingress Protection:-
Material Flammability Rating:-
Features:-
Shielding:-
Current Rating (Amps):-
Voltage Rating:-
Cable Opening:-
Operating Temperature:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT BACC63CU11-98SA

BACC63CU11-98SA

CONN RCPT FMALE 6POS GOLD CRIMP
HOT KPSE06E24-61PY

KPSE06E24-61PY

CONN PLUG MALE 61POS GOLD CRIMP
HOT ACT96WB05PE

ACT96WB05PE

ACT96WB05PE
IXGK55N120A3H1

IXGK55N120A3H1

IGBT 1200V 125A 460W TO264

CS42428-DQZR

CS42428-DQZR

IC CODEC 8CH 114DB 192KHZ 64LQFP

801-009-02NF8-13PA

801-009-02NF8-13PA

CONN RCPT MALE 13POS GOLD CRIMP

BACC63CU11-99SD

BACC63CU11-99SD

BACC 7C 7#20 SKT RECP

Top