DLA100IM1200TZ-TUB

Image is for reference,
please contact us to get the real picture

Part No :

DLA100IM1200TZ-TUB

Manufacturer
Wickmann / Littelfuse
Description
RECTIFIER 1200V 100A TO-268AA
Catalog
Diodes - Bridge Rectifiers
Shipped from
HK warehouse
Expected Shipping Date
Aug 03 - Aug 07 2025
DataSheet
DLA100IM1200TZ-TUB PDF
Availability
0 pieces
Unit Price
$6.42000

Current price of DLA100IM1200TZ-TUB is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Tube
Part Status:Active
Diode Type:Standard
Technology:Standard
Voltage - Peak Reverse (Max):1200 V
Current - Average Rectified (Io):100 A
Voltage - Forward (Vf) (Max) @ If:1.34 V @ 100 A
Current - Reverse Leakage @ Vr:20 µA @ 1200 V
Operating Temperature:-55°C ~ 150°C (TJ)
Mounting Type:Surface Mount
Package / Case:TO-268-3, D³Pak (2 Leads + Tab), TO-268AA
Supplier Device Package:TO-268AA (D3Pak-HV)
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT DB102-G

DB102-G

BRIDGE RECT 1PHASE 100V 1A DB
HOT VBO130-16NO7

VBO130-16NO7

BRIDGE RECT 1P 1.6KV 122A PWS-E
HOT CBRHD-01 BK PBFREE

CBRHD-01 BK PBFREE

BRIDGE RECT 1P 100V 500MA HD DIP
SXT22410EB07-20.000MT

SXT22410EB07-20.000MT

CRYSTAL 20.0000MHZ 10PF SMD

SIT1602BC-83-18N-33.000000Y

SIT1602BC-83-18N-33.000000Y

MEMS OSC XO 33.0000MHZ H/LV-CMOS

DLA100IM1200TZ-TUB

DLA100IM1200TZ-TUB

RECTIFIER 1200V 100A TO-268AA

FODM1009R2

FODM1009R2

OPTOISO 5KV 1CH TRANS LSOP4

Top