K1050E70RP2

Image is for reference,
please contact us to get the real picture

Part No :

K1050E70RP2

Manufacturer
Wickmann / Littelfuse
Description
SIDAC 95-113V 1A TO92
Catalog
Thyristors - DIACs, SIDACs
Shipped from
HK warehouse
Expected Shipping Date
Mar 30 - Apr 03 2024
DataSheet
K1050E70RP2 PDF
Availability
0 pieces
Unit Price
$0.40860

Due to the large price fluctuation in 2021-2022, please send an inquiry to get the latest quotation, The current price of K1050E70RP2 is for reference only, if you want to get the best price, please submit an inquiry or email directly to our sales team [email protected]

Type Description
Series:-
Package:Tape & Reel (TR)
Part Status:Active
Voltage - Breakover:95 ~ 113V
Current - Breakover:10 µA
Current - Hold (Ih) (Max):150 mA
Current - Peak Output:1 A
Operating Temperature:-40°C ~ 125°C (TJ)
Package / Case:TO-226-2, TO-92-2 (TO-226AC) (Formed Leads)
Supplier Device Package:TO-92
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT MKP9V160RLG

MKP9V160RLG

DIAC, 170V MAX, DO-41
HOT K2400GHRP

K2400GHRP

SIDAC 220-250V 1A DO15
HOT K2200EH70RP3

K2200EH70RP3

SIDAC 205-230V 1A TO92
K1050E70RP2

K1050E70RP2

SIDAC 95-113V 1A TO92

Top