MDNA280UB2200P-PC

Image is for reference,
please contact us to get the real picture

Part No :

MDNA280UB2200P-PC

Manufacturer
Wickmann / Littelfuse
Description
MDNA280UB2200PTED-PC
Catalog
Thyristors - SCRs - Modules
Shipped from
HK warehouse
Expected Shipping Date
Aug 14 - Aug 18 2025
DataSheet
MDNA280UB2200P-PC PDF
Availability
0 pieces
Unit Price
$123.59071

Current price of MDNA280UB2200P-PC is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Box
Part Status:Active
Structure:-
Number of SCRs, Diodes:-
Voltage - Off State:-
Current - On State (It (AV)) (Max):-
Current - On State (It (RMS)) (Max):-
Voltage - Gate Trigger (Vgt) (Max):-
Current - Gate Trigger (Igt) (Max):-
Current - Non Rep. Surge 50, 60Hz (Itsm):-
Current - Hold (Ih) (Max):-
Operating Temperature:-
Mounting Type:-
Package / Case:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT T9G0081003DH

T9G0081003DH

SCR PHASE CTRL MOD 800V 1000A
HOT T201N70TOHXPSA1

T201N70TOHXPSA1

SCR MODULE 7000V 385A DO200AB
HOT VVZ110-12IO7

VVZ110-12IO7

RECT BRIDGE 3PH 110A 1200V PWSE2
FC3BSHHEF12.0-T3

FC3BSHHEF12.0-T3

CRYSTAL 12MHZ 10PF SMT

G061673000

G061673000

MOUNTING BASE 80X15

MDNA280UB2200P-PC

MDNA280UB2200P-PC

MDNA280UB2200PTED-PC

STG025M6CN

STG025M6CN

STG025M6CN = THRU-HOLE

Top