BT151S-650R,118

Image is for reference,
please contact us to get the real picture

Part No :

BT151S-650R,118

Manufacturer
WeEn Semiconductors Co., Ltd
Description
SCR 650V 12A DPAK
Catalog
Thyristors - SCRs
Shipped from
HK warehouse
Expected Shipping Date
Jul 04 - Jul 08 2025
DataSheet
BT151S-650R,118 PDF
Availability
0 pieces
Unit Price
$0.83000

Current price of BT151S-650R,118 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Tape & Reel (TR)Cut Tape (CT)
Part Status:Active
Voltage - Off State:650 V
Voltage - Gate Trigger (Vgt) (Max):1.5 V
Current - Gate Trigger (Igt) (Max):15 mA
Voltage - On State (Vtm) (Max):1.75 V
Current - On State (It (AV)) (Max):7.5 A
Current - On State (It (RMS)) (Max):12 A
Current - Hold (Ih) (Max):20 mA
Current - Off State (Max):500 µA
Current - Non Rep. Surge 50, 60Hz (Itsm):120A, 132A
SCR Type:Standard Recovery
Operating Temperature:-40°C ~ 125°C
Mounting Type:Surface Mount
Package / Case:TO-252-3, DPak (2 Leads + Tab), SC-63
Supplier Device Package:DPAK
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT EC103M3AP

EC103M3AP

SCR 600V 800MA TO92
HOT VS-111RKI120PBF

VS-111RKI120PBF

SCR 1.2KV 172A TO209AC
HOT S8X8TS2RP

S8X8TS2RP

SCR 800V 800MA SOT223
BT151S-650R,118

BT151S-650R,118

SCR 650V 12A DPAK

USBBFTV6G

USBBFTV6G

CONN PLUG USB2.0 TYPEB 4POS SLD

Top