TN2010H-6G

Image is for reference,
please contact us to get the real picture

Part No :

TN2010H-6G

Manufacturer
STMicroelectronics
Description
SCR 600MV 20A D2PAK
Catalog
Thyristors - SCRs
Shipped from
HK warehouse
Expected Shipping Date
Jul 07 - Jul 11 2025
DataSheet
TN2010H-6G PDF
Availability
0 pieces
Unit Price
$0.53655

Current price of TN2010H-6G is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Tube
Part Status:Active
Voltage - Off State:600 mV
Voltage - Gate Trigger (Vgt) (Max):1.3 V
Current - Gate Trigger (Igt) (Max):10 mA
Voltage - On State (Vtm) (Max):1.6 V
Current - On State (It (AV)) (Max):12.7 A
Current - On State (It (RMS)) (Max):20 A
Current - Hold (Ih) (Max):40 mA
Current - Off State (Max):5 µA
Current - Non Rep. Surge 50, 60Hz (Itsm):197A, 180A
SCR Type:Sensitive Gate
Operating Temperature:-40°C ~ 150°C (TJ)
Mounting Type:Surface Mount
Package / Case:TO-263-3, D²Pak (2 Leads + Tab), TO-263AB
Supplier Device Package:D2PAK
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT S6008NS2TP

S6008NS2TP

SCR 600V 8A TO263
HOT MCR12DSMT4G

MCR12DSMT4G

SCR 600V 12A DPAK
HOT TN1215-600G

TN1215-600G

SCR 600V 12A D2PAK
FL1P-16NJ-1-Y12V

FL1P-16NJ-1-Y12V

LED YEL 16MM NUT 12VAC/DC STK

CXM-7-27-95-36-AA00-F2-3

CXM-7-27-95-36-AA00-F2-3

LED COB WHT 7.5MM 2700K 95CRI

TN2010H-6G

TN2010H-6G

SCR 600MV 20A D2PAK

Top