SK020LTP

Image is for reference,
please contact us to get the real picture

Part No :

SK020LTP

Manufacturer
Wickmann / Littelfuse
Description
SCR 1KV 20A ITO220AB
Catalog
Thyristors - SCRs
Shipped from
HK warehouse
Expected Shipping Date
Aug 12 - Aug 16 2025
DataSheet
SK020LTP PDF
Availability
0 pieces
Unit Price
$1.28063

Current price of SK020LTP is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:Teccor®
Package:Tube
Part Status:Active
Voltage - Off State:1 kV
Voltage - Gate Trigger (Vgt) (Max):1.5 V
Current - Gate Trigger (Igt) (Max):30 mA
Voltage - On State (Vtm) (Max):1.6 V
Current - On State (It (AV)) (Max):12.8 A
Current - On State (It (RMS)) (Max):20 A
Current - Hold (Ih) (Max):40 mA
Current - Off State (Max):20 µA
Current - Non Rep. Surge 50, 60Hz (Itsm):255A, 300A
SCR Type:Standard Recovery
Operating Temperature:-40°C ~ 125°C (TJ)
Mounting Type:Through Hole
Package / Case:TO-220-3 Isolated Tab
Supplier Device Package:ITO-220AB
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT S8010NTP

S8010NTP

SCR 800V 10A TO263
HOT VS-25TTS12HM3

VS-25TTS12HM3

SCR 1.2KV 25A TO220AB
HOT CLB40I1200PZ-TUB

CLB40I1200PZ-TUB

SCR 1.2KV 63A TO263
SK020LTP

SK020LTP

SCR 1KV 20A ITO220AB

A11-47CS

A11-47CS

COMP O= .420,L= 1.28,W= .063

DCLC-J37PAFE

DCLC-J37PAFE

CONN D-SUB PLUG 37POS R/A SLDR

4P82EA51N00066

4P82EA51N00066

IO NICU MESHG PU V0 REC

Top