MMDT4126-7

Image is for reference,
please contact us to get the real picture

Part No :

MMDT4126-7

Manufacturer
Zetex Semiconductors (Diodes Inc.)
Description
TRANS 2PNP 25V 0.2A SOT363
Catalog
Transistors - Bipolar (BJT) - Arrays
Shipped from
HK warehouse
Expected Shipping Date
Jul 30 - Aug 03 2025
DataSheet
MMDT4126-7 PDF
Availability
0 pieces
Unit Price
$0.00000

Current price of MMDT4126-7 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Tape & Reel (TR)Cut Tape (CT)
Part Status:Obsolete
Transistor Type:2 PNP (Dual)
Current - Collector (Ic) (Max):200mA
Voltage - Collector Emitter Breakdown (Max):25V
Vce Saturation (Max) @ Ib, Ic:400mV @ 5mA, 50mA
Current - Collector Cutoff (Max):50nA (ICBO)
DC Current Gain (hFE) (Min) @ Ic, Vce:120 @ 2mA, 1V
Power - Max:200mW
Frequency - Transition:250MHz
Operating Temperature:-55°C ~ 150°C (TJ)
Mounting Type:Surface Mount
Package / Case:6-TSSOP, SC-88, SOT-363
Supplier Device Package:SOT-363
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 2N2913

2N2913

TRANS 2NPN 30MA 45V TO78-6
HOT CA3083MZ

CA3083MZ

TRANS 5NPN 15V 0.1A 16SOIC
HOT ZDT705TA

ZDT705TA

TRANS 2PNP DARL 120V 1A SM8
AMPDADH-A10T3

AMPDADH-A10T3

OSC MEMS XO DUAL OUTPUT

MCP6V12T-E/MS

MCP6V12T-E/MS

IC OPAMP ZERO-DRIFT 2 CIRC 8MSOP

MMDT4126-7

MMDT4126-7

TRANS 2PNP 25V 0.2A SOT363

6261-12-0

6261-12-0

TEST LEAD BANANA TO GRABBER 12"

Top