2DB1184Q-13

Image is for reference,
please contact us to get the real picture

Part No :

2DB1184Q-13

Manufacturer
Zetex Semiconductors (Diodes Inc.)
Description
TRANS PNP 50V 3A DPAK
Catalog
Transistors - Bipolar (BJT) - Single
Shipped from
HK warehouse
Expected Shipping Date
Aug 09 - Aug 13 2025
DataSheet
2DB1184Q-13 PDF
Availability
3520 pieces
Unit Price
$0.63000

Current price of 2DB1184Q-13 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Tape & Reel (TR)Cut Tape (CT)
Part Status:Active
Transistor Type:PNP
Current - Collector (Ic) (Max):3 A
Voltage - Collector Emitter Breakdown (Max):50 V
Vce Saturation (Max) @ Ib, Ic:1V @ 200mA, 2A
Current - Collector Cutoff (Max):1µA (ICBO)
DC Current Gain (hFE) (Min) @ Ic, Vce:120 @ 500mA, 3V
Power - Max:15 W
Frequency - Transition:110MHz
Operating Temperature:-55°C ~ 150°C (TJ)
Mounting Type:Surface Mount
Package / Case:TO-252-3, DPak (2 Leads + Tab), SC-63
Supplier Device Package:TO-252-3
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT MMBT3906FZ-7B

MMBT3906FZ-7B

TRANS PNP 40V 0.2A X2-DFN060
HOT PBSS4350D,125

PBSS4350D,125

TRANS NPN 50V 3A 6TSOP
HOT JANTXV2N5339

JANTXV2N5339

TRANS NPN 100V 5A TO39
SXT21410DB27-48.000MT

SXT21410DB27-48.000MT

CRYSTAL 48.0000MHZ 10PF SMD

SIT9120AI-1D3-33S98.304000X

SIT9120AI-1D3-33S98.304000X

MEMS OSC XO 98.3040MHZ LVPECL

2DB1184Q-13

2DB1184Q-13

TRANS PNP 50V 3A DPAK

FWH5-015A6FR

FWH5-015A6FR

FUSE BUSS 500V 15A 6X32

Top