352-40-20-M8-S-55

Image is for reference,
please contact us to get the real picture

Part No :

352-40-20-M8-S-55

Manufacturer
J.W. Winco
Description
RUBBER BUMPER CYLINDRICAL STEEL
Catalog
Bumpers, Feet, Pads, Grips
Shipped from
HK warehouse
Expected Shipping Date
Aug 15 - Aug 19 2025
DataSheet
352-40-20-M8-S-55 PDF
Availability
100 pieces
Unit Price
$2.13000

Current price of 352-40-20-M8-S-55 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:*
Package:Box
Part Status:Active
Type:-
Shape:Cylindrical, Recessed Center
Color:Black
Size / Dimension:1.570" Dia (39.88mm)
Thickness:0.790" (20.07mm)
Material:Rubber
Hardness:5 Shore A
Form:-
Mounting Type:Threaded Stud
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 10N6WP2

10N6WP2

NYLON BASE LEVELING MOUNT STEEL
HOT 6T2SNS

6T2SNS

SNAP LOCK LEVELING MOUNT
HOT 343.6-32-M10-63-KS

343.6-32-M10-63-KS

STAINLESS STEEL LEVELING FEET
P6KE350CATR

P6KE350CATR

TVS DIODE 300V 482V DO15

Q-2W03L0005009I

Q-2W03L0005009I

SMA-SJB/SMB-SJ G316 9I

Q-38019000H002M

Q-38019000H002M

SMA-RP/MCX-RP G142 2M

352-40-20-M8-S-55

352-40-20-M8-S-55

RUBBER BUMPER CYLINDRICAL STEEL

Top