JR16-RYG-DMCM1

Image is for reference,
please contact us to get the real picture

Part No :

JR16-RYG-DMCM1

Manufacturer
Mallory Sonalert Products
Description
COMPLETE UNIT GN/RD/YL 3 STACK
Catalog
Stackable Tower Lighting, Beacons, and Components
Shipped from
HK warehouse
Expected Shipping Date
Jul 01 - Jul 05 2025
DataSheet
JR16-RYG-DMCM1 PDF
Availability
2 pieces
Unit Price
$115.97000

Current price of JR16-RYG-DMCM1 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:JR
Package:Bulk
Part Status:Active
Type:Complete Unit
Number of Stacks:3
Lamp Type:LED
Light Color:Green, Red, Yellow
Function:Steady Lighting, Pulse Tone
Voltage - Supply:9 ~ 16VDC
Features:Alarm
Termination Style:Wire Leads
Ingress Protection:NEMA 12, IP52
Operating Temperature:-30°C ~ 60°C
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT MT4B1BL-R

MT4B1BL-R

TOWER 45MM STEADY 110V RED
HOT TL50HGRAQ

TL50HGRAQ

TL50H TOWER LIGHT: 2-COLOR AUDIB
HOT JR16-RYG-DLCT1

JR16-RYG-DLCT1

COMPLETE UNIT GN/R/Y CONT 3STACK
A5303SLETR-T

A5303SLETR-T

IC SMOKE DETECTOR PHOTO 20TSSOP

JR16-RYG-DMCM1

JR16-RYG-DMCM1

COMPLETE UNIT GN/RD/YL 3 STACK

K50LGRYNQ

K50LGRYNQ

EZ-LIGHT 3 COLOR INDICATOR

MC6DC-0110

MC6DC-0110

CONTROL SAFETY MAT 24V

Top