PTD-TC-102-RYG-B

Image is for reference,
please contact us to get the real picture

Part No :

PTD-TC-102-RYG-B

Manufacturer
IndustrialeMart
Description
56MM MULTI DOME 24V RYG
Catalog
Stackable Tower Lighting, Beacons, and Components
Shipped from
HK warehouse
Expected Shipping Date
Jul 02 - Jul 06 2025
DataSheet
PTD-TC-102-RYG-B PDF
Availability
5 pieces
Unit Price
$141.25000

Current price of PTD-TC-102-RYG-B is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:PTD
Package:Box
Part Status:Active
Type:Complete Unit
Number of Stacks:1
Lamp Type:LED
Light Color:Green, Red, Yellow
Function:Steady
Voltage - Supply:24VAC/DC
Features:Direct Mounting
Termination Style:Spring Terminal
Ingress Protection:IP65 - Dust Tight, Water Resistant
Operating Temperature:-15°C ~ 40°C
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT MS70S-M10-Y

MS70S-M10-Y

STROBE 70MM 110V DIRECT YLW
HOT TL50GYRA

TL50GYRA

COMPLETE UNIT GRN/RED/YEL ALARM
HOT 63930101

63930101

SIGNAL TOWER KS40 CL BWM 24VAC/D
SMD1R

SMD1R

TEST LEAD BANANA TO GRABBER 9"

CD4098BM96

CD4098BM96

IC MULTIVIBRATOR 100NS 16SOIC

PTD-TC-102-RYG-B

PTD-TC-102-RYG-B

56MM MULTI DOME 24V RYG

TS1101-200DB

TS1101-200DB

DEMO BOARD TS1101-200 OPAMP

Top