PDU3VSR3G60

Image is for reference,
please contact us to get the real picture

Part No :

PDU3VSR3G60

Manufacturer
Tripp Lite
Description
PDU 3-PHASE SWITCHED 208V 12.6KW
Catalog
Power Distribution, Surge Protectors
Shipped from
HK warehouse
Expected Shipping Date
Jul 16 - Jul 20 2025
DataSheet
PDU3VSR3G60 PDF
Availability
0 pieces
Unit Price
$1344.15000

Current price of PDU3VSR3G60 is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Bulk
Part Status:Obsolete
Type:PDU (Power Distribution Unit)
Mounting Type:Rack, Vertical
Current - Max:35A
Region Utilized:-
Overload Protection:Circuit Breaker(s)
Connector - AC Input:IEC 309
Connector - AC Output:IEC 320-C13 (21), C19 (3)
Voltage - Input:208V
Housing Material:Steel
Media Lines Protected:-
AC Outlets:24
Energy:-
Cord Length:3' (0.92m)
Approval Agency:NOM, UL
Features:Load Meter
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT PS2408RA

PS2408RA

POWER STRIP 24" 8 OUT 15'CORD
HOT 6720005414

6720005414

BUS BAR
HOT 1586H12A1

1586H12A1

POWER STRIP 60" 15A 12OUT 6'C
PDU3VSR3G60

PDU3VSR3G60

PDU 3-PHASE SWITCHED 208V 12.6KW

P51-3000-A-F-MD-5V-000-000

P51-3000-A-F-MD-5V-000-000

SENSOR 3000PSI 1/4-18NPT 1-5V

DAMMP7H2SJ

DAMMP7H2SJ

CONN D-SUB RCPT 7POS R/A SLDR

ZEDB25-P-BA-30

ZEDB25-P-BA-30

CONN D-SUB PLUG 25POS R/A SLDR

Top