P24E29M-BU2C

Image is for reference,
please contact us to get the real picture

Part No :

P24E29M-BU2C

Manufacturer
Panduit Corporation
Description
PDU VERT C13 C19 MONITORED SWTCH
Catalog
Power Distribution, Surge Protectors
Shipped from
HK warehouse
Expected Shipping Date
Jul 15 - Jul 19 2025
DataSheet
P24E29M-BU2C PDF
Availability
0 pieces
Unit Price
$1626.04800

Current price of P24E29M-BU2C is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:-
Package:Bulk
Part Status:Active
Type:-
Mounting Type:-
Current - Max:-
Region Utilized:-
Overload Protection:-
Connector - AC Input:-
Connector - AC Output:-
Voltage - Input:-
Housing Material:-
Media Lines Protected:-
AC Outlets:-
Energy:-
Cord Length:-
Approval Agency:-
Features:-
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT P36E35M-BL2B

P36E35M-BL2B

PDU VERT C13 C19 MONITORED SWTCH
HOT PDU3EVN6L2120

PDU3EVN6L2120

5.8KW 3-PHASE PDU, VERTICAL, MON
HOT 9BG1-141002

9BG1-141002

PWR STRIP ASSY 14OUT 20AMP
7M-10.000MBBK-T

7M-10.000MBBK-T

CRYSTAL 10.0000MHZ 20PF SMD

MM120-001225

MM120-001225

WELDER STRAIN GAUGE 115V

82V2081PPG

82V2081PPG

IC TELECOM INTERFACE 44TQFP

P24E29M-BU2C

P24E29M-BU2C

PDU VERT C13 C19 MONITORED SWTCH

Top