419D-1L

Image is for reference,
please contact us to get the real picture

Part No :

419D-1L

Manufacturer
MG Chemicals
Description
CONFORMAL COATING UL 94V-1
Catalog
Coating, Grease, Repair
Shipped from
HK warehouse
Expected Shipping Date
May 17 - May 21 2024
DataSheet
419D-1L PDF
Availability
4 pieces
Unit Price
$52.45000

Due to the large price fluctuation in 2021-2022, please send an inquiry to get the latest quotation, The current price of 419D-1L is for reference only, if you want to get the best price, please submit an inquiry or email directly to our sales team [email protected]

Type Description
Series:419D
Package:Box
Part Status:Active
Type:Acrylic Adhesive
Color:-
Form:Can, 945 mL (1.99 pt)
Features:Coating
Shelf Life:60 Months
Shelf Life Start:Date of Manufacture
Storage/Refrigeration Temperature:23°F ~ 104°F (-5°C ~ 40°C)
Shipping Info:Due to possible restrictions, a change in ship method may be required.
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT L260-N1

L260-N1

L260NP, SQUEEZE TUBE
HOT CTAR-P

CTAR-P

AR ACRYLIC CONFORMAL COATING
HOT 8696

8696

URETHANE CONFORMAL COATING
419D-1L

419D-1L

CONFORMAL COATING UL 94V-1

Top