RLR20C1002GPBSL

Image is for reference,
please contact us to get the real picture

Part No :

RLR20C1002GPBSL

Manufacturer
Vishay / Dale
Description
ERL-20 10K 2% T-1 RLR20C1002GP B
Catalog
Resistors-Through Hole
Shipped from
HK warehouse
Expected Shipping Date
Aug 19 - Aug 23 2025
DataSheet
RLR20C1002GPBSL PDF
Availability
0 pieces
Unit Price
$2.68250

Current price of RLR20C1002GPBSL is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:Military, MIL-PRF-39017/02, RLR20
Package:Bulk
Part Status:Active
Resistance:10 kOhms
Tolerance:±2%
Power (Watts):0.5W, 1/2W
Composition:Metal Film
Features:Military, Moisture Resistant, Weldable
Temperature Coefficient:±100ppm/°C
Operating Temperature:-65°C ~ 150°C
Package / Case:Axial
Supplier Device Package:Axial
Size / Dimension:0.138" Dia x 0.375" L (3.51mm x 9.53mm)
Height - Seated (Max):-
Number of Terminations:2
Failure Rate:P (0.1%)
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT RLR05C1742FSRE7

RLR05C1742FSRE7

ERL-05 17.4K 1% T-1 RLR05C1742FS
HOT RLR07C3904GRBSL

RLR07C3904GRBSL

RES 3.9M OHM 2% 1/4W AXIAL
HOT RNC55H25R5FSBSL

RNC55H25R5FSBSL

RES 25.5 OHM 1/8W 1% AXIAL
RLR20C1002GPBSL

RLR20C1002GPBSL

ERL-20 10K 2% T-1 RLR20C1002GP B

LQW18AN4N3B8ZD

LQW18AN4N3B8ZD

FIXED IND 4.3NH 2.1A 36 MOHM

VLF3012ST-150MR49

VLF3012ST-150MR49

FIXED IND 15UH 490MA 490 MOHM

KPT01F14-19S

KPT01F14-19S

CONN RCPT FMALE 19P GOLD SLD CUP

Top