SSF67A25B300

Image is for reference,
please contact us to get the real picture

Part No :

SSF67A25B300

Manufacturer
Sensata Technologies – Cynergy3
Description
DL LVL FLOATSW 327MM TOTAL L
Catalog
Float, Level Sensors
Shipped from
HK warehouse
Expected Shipping Date
May 20 - May 24 2024
DataSheet
SSF67A25B300 PDF
Availability
0 pieces
Unit Price
$233.01000

Due to the large price fluctuation in 2021-2022, please send an inquiry to get the latest quotation, The current price of SSF67A25B300 is for reference only, if you want to get the best price, please submit an inquiry or email directly to our sales team [email protected]

Type Description
Series:SSF67
Package:Bulk
Part Status:Active
Type:Liquid
Output Type:Switch (2) (Single Float)
Output Configuration:SPST-NO, SPST-NC
Current:600 mA
Minimum Liquid Specific Gravity:0.8
Switch Actuation Level:0.984", 11.811" (25mm, 300mm)
Mounting Type:Panel Mount, M16x2 Thread
Material - Housing & Prism:316 Stainless Steel
Operating Temperature:135°C
Voltage Rating:120VDC, 250VAC
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT LLG810D324-005

LLG810D324-005

LIQUID LEVEL SENSOR
HOT RSF88Y100R

RSF88Y100R

FLOATSWITCH HORZ .6A NO/NC POLY
HOT FM10-SMD15-NONO

FM10-SMD15-NONO

DUAL SWITCH 9" LONG 1" NPT, EXT
SMDJ75C

SMDJ75C

TVS DIODE 75V 134V DO-214AB (SMC

SMV2026-079LF

SMV2026-079LF

DIODE VARACTOR

M32M16/6/OM

M32M16/6/OM

REDUCER M32/M16 X1,5

SSF67A25B300

SSF67A25B300

DL LVL FLOATSW 327MM TOTAL L

Top