JKV8827SPBG

Image is for reference,
please contact us to get the real picture

Part No :

JKV8827SPBG

Manufacturer
Transforming Technologies
Description
SNAP CUFF, BURGUNDY, 3X-LARGE
Catalog
Static Control Clothing
Shipped from
HK warehouse
Expected Shipping Date
Aug 17 - Aug 21 2025
DataSheet
JKV8827SPBG PDF
Availability
10 pieces
Unit Price
$42.79000

Current price of JKV8827SPBG is for reference only, if you want to get best price, please submit a inquiry or direct email to our sales team [email protected]

Type Description
Series:JKV
Package:Box
Part Status:Not For New Designs
Clothing Type:Smock, Jacket Length with Cuffs
Size:3XLarge
Material:Polyester
Color:Burgundy
Features:ESD Safe, Pockets, Snap Adjustable Cuffs
  • Please confirm the specifications of the products when ordering.
  • MOQ means the minimum order quantity required to purchase each parts.
  • If you have special order instructions,please note it on the ordering pages.
  • The Pre-Shipment Inspection (PSI) will be applied.
  • You can email us to change the order details before shipment.
  • Orders cannot be canceled after shipping the packages.
  • TT in advance (bank transfer), Credit Card, PayPal can be chosen.
  • Cash transfer only. (Transfer with checks and bills are not accepted.)
  • Customer is responsible for paying all possible charges,including sales tax, VAT and customs charges,etc.
  • If you need the detailed invoice or tax ID,please email us.
  • FedEx, DHL, and UPS can be selected.
  • You can select whether to charge shipping fee by your shipping account or to charge by our side.
  • Please confirm with the logistics company in advance if you are in a remote area. (It may cost extra fees (35-50 USD) for delivery at those areas.)
  • The shopping cart will automatically calculate the shipping cost.
  • Delivery time: At the same day (Order deadline is 2pm, HK Time).
  • Delivery date: usually 2 to 7 working days.
  • It is unable to appoint a date of delivery.
  • Tracking number will be sent once your order has been shipped. (It may take up to 24 hours before carriers display the info.)
HOT 74313

74313

SMOCK, CONVERTIBLE SLEEVE, SNAP
HOT JKV8829BG

JKV8829BG

KNIT CUFF, BURGUNDY, 5X-LARGE
HOT 68124

68124

GLOVES ESD INSPECTION X-S
SiT9365AI-4B1-33E300.000000T

SiT9365AI-4B1-33E300.000000T

XTAL OSC XO 300.0000MHZ HCSL

JKV8827SPBG

JKV8827SPBG

SNAP CUFF, BURGUNDY, 3X-LARGE

ZXM66P02N8TA

ZXM66P02N8TA

MOSFET P-CH 20V 6.4A 8SO

975454701

975454701

CONN TIP JACK THRD RED

Top